Case Study Foamed Cement Successfully Seals Ultradeepwater Well
Operationally versatile system enabled foamed cementing in the riserless well section, cutting time from 15 to 10 hours.
Ensure zonal isolation and casing integrity
In deep water, cementing operations are performed in technically and logistically challenging environments because of the risks associated with the conductor and surface casing cementing. Understanding these technical challenges is key to designing cement slurries that can meet deepwater specifications and provide required zonal isolation.